Garfield Reservoir Replacement Project

2 Documents in Project

Summary

SCH Number
2012111028
Lead Agency
City of South Pasadena
Document Title
Garfield Reservoir Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2013
Present Land Use
Land Use: Garfield Reservoir; Z: Community Facilities GPD: Community Facilities (Reservoir)
Document Description
The City of South Pasadena (City) proposes the construction of a replacement for the Garfield Reservoir. The Garfield Reservoir is a 6.25-million-gallon (MG) reservoir, constructed of concrete and covered by a metal roof supported on a wood frame. A replacement reservoir is needed to bring the Garfield Reservoir up to current seismic standards. The proposed project includes demolition of the existing Garfield Reservoir and pump station and construction of two replacement reservoirs, a pump station, inlet/outlet vault, rechlorination room, and a Water Distribution support yard on the project site. The proposed project also includes the replacement of a storm drain within an existing easement through the adjacent Blair High School athletic field. Construction of the proposed project is expected to begin in fall 2013 and is expected to last for 18 months.

Contact Information

Name
Paul Toor
Agency Name
City of South Pasadena Public Works Department
Contact Types
Lead/Public Agency

Location

Cities
South Pasadena
Counties
Los Angeles
Cross Streets
Garfield Avenue and Hardison Lane
Zip
91030
Total Acres
2.35
Parcel #
5324-018-902
State Highways
SR 110
Railways
Metrolink
Airports
No
Schools
Blair HS
Waterways
No

Notice of Determination

Approving Agency
City of South Pasdena City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print