Natomas East Main drain Canal
Description
Strengthen approximately 4,800 feet of flood control levee along the lower American River in the American River Parkway. Construction would be implemented over two construction seasons: the upstream segment is scheduled to be constructed in 2013 and the downstream segment is scheduled to be constructed in 2014.