SCH Number 2012062056
Project Info
- Title
- Natomas East Main drain Canal
- Description
- Strengthen approximately 4,800 feet of flood control levee along the lower American River in the American River Parkway. Construction would be implemented over two construction seasons: the upstream segment is scheduled to be constructed in 2013 and the downstream segment is scheduled to be constructed in 2014.
2 documents in project