Natomas East Main drain Canal
2 Documents in Project
Summary
SCH Number
2012062056
Lead Agency
Central Valley Flood Protection Board
Document Title
Natomas East Main drain Canal
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2012
Document Description
Strengthen approximately 4,800 feet of flood control levee along the lower American River in the American River Parkway. Construction would be implemented over two construction seasons: the upstream segment is scheduled to be constructed in 2013 and the downstream segment is scheduled to be constructed in 2014.
Contact Information
Name
Mary Ann Hadden
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Cross Streets
Right (north) levee of the lower American River upstream of Sac River confluence
State Highways
I-80 and Hwy 160
Railways
UPRR
Waterways
American River
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.