- Final Site Plan No. PSR 12-001
- Description
- The project would allow a trench, an underground water transfer pipeline, and a pump to connect two storm water retention basins on a 2,460 foot-long portion of a 14-acre site in the M-1-SR (Light Manufacturing - Site Review) and AE-40 (Exclusive Agricultural - 40 acre minimum) Zones. The construction would last 8 weeks and employ 6 people. Storm water would be pumped from the primary basin to the secondary basin during heavy rain events to reduce the potential of flooding.
2 documents in project