Final Site Plan No PSR 12-001 to amend Final Site Plan No. PSR 93-007 and allow a trench, an underground water transfer pipeline, and a pump

2 Documents in Project

Summary

SCH Number
2012061017
Lead Agency
Tulare County
Document Title
Final Site Plan No PSR 12-001 to amend Final Site Plan No. PSR 93-007 and allow a trench, an underground water transfer pipeline, and a pump
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2012
Present Land Use
The subject property is zoned M-1-SR and AE-40 and is a fertilizer manufacturing plant. The project site lies within the Rural Valley Lands Plan and is designated "non-agricultural".

Document Description
The project would allow a trench, an underground water transfer pipeline, and a pump to connect two storm water retention basins on a 2,460 foot-long portion of a 14-acre site in the M-1-SR (Light Manufacturing - Site Review) and AE-40 (Exclusive Agricultural - 40 acre minimum) Zones. The construction would last 8 weeks and employ 6 people. Storm water would be pumped from the primary basin to the secondary basin during heavy rain events to reduce the potential of flooding.

Contact Information
Hector Guerra
Tulare County Resource Management Agency
5961 South Mooney Boulevard
Visalia, CA 93277-9394

Phone : (559) 624-7000

Location

Coordinates
35°57'52"N 118°59'50"W
Counties
Tulare
Cross Streets
Avenue 96 and Road 256
Zip
93219
Total Acres
14
Parcel #
304-150-085
Railways
SJV&TV
Schools
Terra Bella
Waterways
Seasonal Creek
Township
22S
Range
28E
Section
31
Base
MDB&M
Other Location Info
City/Nearest Community: Terra Bella

Notice of Determination

Approving Agency
Tulare County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
California Department of Fish & Game 1416 Ninth St., 12th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A