SCH Number 2012042014
Project Info
- Title
- Carr Mine Mining Permit, Use Permit and Reclamation Plan (Project No. MIN11-0001)
- Description
- Phased mining and reclamation of a 39-acre site within three parcels totaling approximately 200 acres, located in a remote, mountainous region. Excavation of about 19 acres of undisturbed land will follow the subsurface extent of a paleochannel (the active mining area); phased reclamation is proposed for both the 19-acre active mining area and some 15 acres of existing surface disturbance resulting from past mining. All mining and reclamation activities will be complete within 15 years.
2 documents in project