SCH Number 2012031100
Project Info
- Title
- Recycled Water Distribution System Expansion
- Description
- The Recycled Water Distribution System Expansion: The Recycled Water Distribution System Expansion will include the construction of ~94,860 feet or 18 miles of recycled water pipelines beneath existing roadways. The pipelines will range from 4 to 16 inches, depending on the location. The pipelines will require excavations depths of 5 to 7 feet within the existing road right-of-way. The Recycled Water Tertiary Treatment Plant: The Recycled Water Tertiary Treatment Plant will include the construction of the new tertiary treatment facilities and a 5,000 - foot recycled water transmission pipeline.
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | El Toro Water District | The Recycled Water Distribution System Expansion and Recycled Water Tertiary Treatment Plant (Project) Clean Water State Revolving Fund (CWSRF) No. C-06-5006-11 | |
NOD | El Toro Water District | Recycled Water Distribution System Expansion | |
NOD | El Toro Water District | Recycled Water Distribution System Expansion | |
NOD | El Toro Water District | Recycled Water Distribution System Expansion | |
MND | El Toro Water District | Recycled Water Distribution System Expansion |