SCH Number 2011121020


Project Info

Title
Installation of Full-Capture Connector Pipe Screens
Description
Purchase and installation of full-capture catch basin inserts to prevent trash/debris from entering the storm drain system. This will ensure full compliance with the National Pollutant Discharge Elimination System Trash Total Maximum Daily Load requirement. Inserts will be installed at approximately 475 locations through the City.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Alhambra Installation of Full-Capture Connector Pipe Screens
City of Alhambra Installation of Full-Capture Connector Pipe Screens