Installation of Full-Capture Connector Pipe Screens

2 Documents in Project

Summary

SCH Number
2011121020
Lead Agency
City of Alhambra
Document Title
Installation of Full-Capture Connector Pipe Screens
Document Type
NOD - Notice of Determination
Received
Posted
1/17/2012
Present Land Use
Various, including R-1, R-2, R-3, Industrial, Commercial
Document Description
Purchase and installation of full-capture catch basin inserts to prevent trash/debris from entering the storm drain system. This will ensure full compliance with the National Pollutant Discharge Elimination System Trash Total Maximum Daily Load requirement. Inserts will be installed at approximately 475 locations through the City.

Contact Information

Name
Lauren Myles
Agency Name
Department Of Utilities
Contact Types
Lead/Public Agency

Location

Cities
Alhambra
Counties
Los Angeles

Notice of Determination

Approving Agency
Alhambra City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print