SCH Number 2011091052


Project Info

Title
Expansion of Groundwater Extraction and Treatment System
Description
This project is proposed by a responsible party, who is required by the Central Coast Water Board to cleanup groundwater at a polluted site. The project consists of five main components 1) upgrade an existing onsite groundwater extraction and treatment system (GETS) to optimize operations, 2) Install and startup six onsite and two offsite groundwater extraction wells; 3) install conveyance piping (about 1,900 linear feet) and pump groundwater from the new wells to the upgraded GETS; 4) treat the polluted water; and 5) recharge the treated water back into a deeper aquifer unit in an onsite injection well.
Download CSV New Search

 

2 documents in project

Type Lead Agency Received Title
Regional Water Quality Control Board, Region 3 (Central Coast), San Luis Obispo Expansion of Groundwater Extraction and Treatment System
Regional Water Quality Control Board, Region 3 (Central Coast), San Luis Obispo Expansion of Groundwater Extraction and Treatment System

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.