SCH Number 2011041009


Project Info

Title
Falcon Ridge Substation Project
Description
Southern California Edison proposes to construct a 66/12 kV substation (Falcon Ridge substation) and related facilities, including two 115 kV subtransmission source line segments to connect the proposed substation to the existing Alder and Etiwands substations; construction of three underground 12 kV distribution getaways; installation of telecommunications facilities (i.e., fiber optic cable) to connect the proposed substation to SCE's telecommunictions network, and upgrades to the switchrack positions at both existing substations as well as an extension of the operating and transfer buses at Alder Substation.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
California Public Utilities Commission (CPUC) Southern California Edison's Falcosn Ridge Substation Project
California Public Utilities Commission (CPUC) Falcon Ridge Substation Project
California Public Utilities Commission (CPUC) Falcon Ridge Substation Project
California Public Utilities Commission (CPUC) Falcon Ridge Substation Project