Falcon Ridge Substation Project

4 Documents in Project

Summary

SCH Number
2011041009
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Falcon Ridge Substation Project
Document Type
EIR - Draft EIR
Received
Present Land Use
Residential, Open Space, Mixed Use, Commercial, and Industrial
Document Description
Southern California Edison proposes to construct a 66/12 kV substation (Falcon Ridge substation) and related facilities, including two 115 kV subtransmission source line segments to connect the proposed substation to the existing Alder and Etiwands substations; construction of three underground 12 kV distribution getaways; installation of telecommunications facilities (i.e., fiber optic cable) to connect the proposed substation to SCE's telecommunictions network, and upgrades to the switchrack positions at both existing substations as well as an extension of the operating and transfer buses at Alder Substation.

Contact Information

Name
John Boccio
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Cities
Fontana, Rancho Cucamonga, Rialto
Counties
San Bernardino
Cross Streets
Casa Grande Avenue, Sierra Avenue, Summit Avenue
Zip
92336
Total Acres
7.5 + linear fac
Parcel #
Multiple
State Highways
I-5, 210
Airports
Rialto Municipal
Schools
Multiple
Waterways
Rialto Channel, San Sevaine Creek, Etiwanda Creek

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Airport/Energy Projects, California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Caltrans, Division of Aeronautics, Department of Water Resources, Office of Historic Preservation, Resources Agency, Department of Toxic Substances Control, Department of Fish and Wildlife, Region 6
State Reviewing Agency Comments
Department of Toxic Substances Control, Department of Fish and Wildlife, Region 6
Development Types
Power:Other Power Type (Subtransmission)(Megawatts 66/12kV)
Local Actions
PTC
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print