SCH Number 2011041008


Project Info

Title
Casa Diablo IV Geothermal Power Plant Draft Supplemental EIR
Description
The Draft SEIR contains supplemental information and analysis to the 2013 Final EIS/EIR to adequately inform the public and local officials in the planning and decision-making process regarding two potential and additional mitigation measures to address reactive organic gas (ROG) emissions from the plant: (1) a stronger leak detection and repair (LDAR) program, and (2) the additional use of leakless or low-leak technology.
Download CSV New Search

 

6 documents in project

Type Lead Agency Received Title
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Power Plant Draft Supplemental EIR
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Power Plant Project
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project (CD-IV Project)
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project