SCH Number 2011041008


Project Info

Title
Casa Diablo IV Geothermal Development Project (CD-IV Project)
Description
The CD-IV Project would construct a new 33 net MW binary power plant, develop an expanded geothermal well field of up to 16 geothermal resource wells (some new and some existing), construct pipelines to bring the geothermal brine to the power plant and pipelines to take the cooled brine to injection wells, and install an electric transmission line to interconnect to the Southern California Edison (SCE) Substation at Substation Road.
Download CSV New Search

 

10 documents in project

Type Lead/Public Agency Received Title
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project (CD-IV Project)
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Project
Great Basin Air Pollution Control District DECISION AND FINDINGS-Casa Diablo IV Geothermal Project
Great Basin Air Pollution Control District CASA DIABLO IV GEOTHERMAL POWER PLANT
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Power Plant Draft Supplemental EIR
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Power Plant Project
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project (CD-IV Project)
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project
Great Basin Air Pollution Control District Casa Diablo IV Geothermal Development Project