Casa Diablo IV Geothermal Development Project (CD-IV Project)
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011041008
- Lead Agency
- Great Basin Air Pollution Control District
- Document Title
- Casa Diablo IV Geothermal Development Project (CD-IV Project)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/21/2014
- Present Land Use
- Various
- Document Description
- The CD-IV Project would construct a new 33 net MW binary power plant, develop an expanded geothermal well field of up to 16 geothermal resource wells, construct pipelines to bring the geothermal brine to the power plant and pipelines to take the cooled brine to injection wells, and install an electric transmission line to interconnect to the Southern CA Edison Substation at Substation Road.
- Contact Information
-
Ian Sudomier
Great Basin Unified Air Pollution Control District
157 Short Street
Bishop, CA 93514-3537
Phone : 760 872-8211 x227
Location
- Coordinates
- 37°39'4.64"N 118°54'57.78"W
- Cities
- Mammoth Lakes
- Counties
- Mono
- Cross Streets
- Near Highway 395 and SR 203
- Zip
- 93546
- Parcel #
- various
- State Highways
- Hwy 395
- Waterways
- Mammoth Creek
- Township
- 3S
- Range
- 27/28E
- Section
- 29-32
- Base
- MDB&M
Notice of Determination
- Approving Agency
- Great Basin Unified Air Pollution Control District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1557 Short Street, Bishop, CA 93514.
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.