SCH Number 2011022049


Project Info

Title
General Electric Site
Description
The DTSC is proposing to approve a draft Remedial Action Plan (RAP) pursuant to authority granted under Chapter 6.8, Division 20, CA Health & Safety Code (H&SC). The purpose of this RAP is to implement a remedial action for the Site that is protective of public health and safety and the environment. The proposed remedial action for the site includes excavation of soil with PCBs and TCE concentrations greater than the clean up goal (10 milligram per kilogram (mg/kg) and 0.74 mg/kg, respectively), groundwater extraction and treatment until TCE concentrations are lower than the clean up goal (5 micrograms per liter (ug/l)), monitored natural attenuations, capping the currently un-paved 6 acre area, ongoing monitoring and maintenance, and institutional controls consisting of revising deed restriction for the Site to ensure that the Site groundwater is not used as a source of potable water and that a soil management plan will be prepared for handling soil brought to the surface by grading, excavation, trenching, or backfilling.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Department of Toxic Substances Control Remedial Action Plan for General Electric Site
Department of Toxic Substances Control General Electric Site