Remedial Action Plan for General Electric Site

2 Documents in Project

Summary

SCH Number
2011022049
Lead Agency
Department of Toxic Substances Control
Document Title
Remedial Action Plan for General Electric Site
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2011
Present Land Use
Commercial/Industrial
Document Description
The DTSC is proposing to approve a draft Remedial Action Plan (RAP) pursuant to authority granted under Chapter 6.8, Division 20, CA Health & Safety Code (H&SC). The purpose of this RAP is to implement a remedial action for the Site that is protective of public health and safety and the environment. The proposed remedial action for the site includes excavation of soil with PCBs and TCE concentrations greater than the clean up goal (10 milligram per kilogram (mg/kg) and 0.74 mg/kg, respectively), groundwater extraction and treatment until TCE concentrations are lower than the clean up goal (5 micrograms per liter (ug/l)), monitored natural attenuations, capping the currently un-paved 6 acre area, ongoing monitoring and maintenance, and institutional controls consisting of revising deed restriction for the Site to ensure that the Site groundwater is not used as a source of potable water and that a soil management plan will be prepared for handling soil brought to the surface by grading, excavation, trenching, or backfilling.

Contact Information

Name
Jacinto Soto
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Oakland
Counties
Alameda
Cross Streets
56th
Zip
94601
Total Acres
24
Parcel #
41-3848-1
State Highways
Hwy 880
Railways
UPRR
Airports
Oakland International
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print