SCH Number 2011021010
Project Info
- Title
- Lemon Grove STEM Academy Modernization & Library Addition
- Description
- The project applicant, Lemon Grove School District, proposes to modernize the existing Lemon Grove Middle School to accommodate the new Science, Technology, Engineering, and Mathematics (STEM) Academy and construct a new joint-use library with an attached public plaza to be operated by the County of San Diego. The modernized campus would have the max capacity of 950 students (6th - 8th). The new library would be 13,500 s.f. and the new building, which would house the school's Administrative Center and Technology Data Center under the same roof, would total 16,903 s.f. The proposed project would necessitate demolition of three buildings totaling 5,019 s.f. along Lincoln Street. The main campus and the school drop-off and pick-up zones would be accessed via two driveways on Lincoln Street, east-ingress-only and west-egress-only driveways. The new staff and visitor parking would provide 41 parking spaces and additional parking would be available through the shared use of the adjacent 29-space Recreation Center parking lot to the north.
3 documents in project