Document Description
The project applicant, Lemon Grove School District, proposes to modernize the existing Lemon Grove Middle School to accommodate the new Science, Technology, Engineering, and Mathematics (STEM) Academy and construct a new joint-use library with an attached public plaza to be operated by the County of San Diego. The modernized campus would have the max capacity of 950 students (6th - 8th). The new library would be 13,500 s.f. and the new building, which would house the school's Administrative Center and Technology Data Center under the same roof, would total 16,903 s.f. The proposed project would necessitate demolition of three buildings totaling 5,019 s.f. along Lincoln Street. The main campus and the school drop-off and pick-up zones would be accessed via two driveways on Lincoln Street, east-ingress-only and west-egress-only driveways. The new staff and visitor parking would provide 41 parking spaces and additional parking would be available through the shared use of the adjacent 29-space Recreation Center parking lot to the north.

Contact Information

Name
Kenneth Fine
Agency Name
Lemon Grove School District
Contact Types
Lead/Public Agency

Location

Cities
Lemon Grove
Counties
San Diego
Cross Streets
7866 Lincoln Street
Zip
91945
Total Acres
~12
State Highways
SR-94
Railways
SD Trolley East Line
Airports
No
Schools
Golden Ave ES
Waterways
No
Township
16S
Range
1W
Section
31
Base
SBB&M

Notice of Determination

Approving Agency
Lemon Grove School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.