SCH Number 2011011078
Project Info
- Title
- Day Creek MDP Line J - Stage 2
- Description
- The proposed project is a plan to develop the Stage 2 portion of the Day Creek Master Drainage Plan Line J storm drain facility. The project consists of a facility construction and subsequent maintenance. The downstream end of Line J, Stage 2 will connect to an existing 6-foot high by 12-foot wide RCB culvert that crosses underneath 68th Street near the northeast corner of the intersection of 68th Street and I-15. From the connection at 68th Street, Line J extends northerly where it connects to an existing upstream portion of Line J on the westerly side of Pats Ranch Road. Line J, Stage 2 will be closed conduit constructed below the earth's surface (existing or proposed) and will be installed using typical trenching methods.
2 documents in project