Day Creek MDP Line J - Stage 2

2 Documents in Project

Summary

SCH Number
2011011078
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Day Creek MDP Line J - Stage 2
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2011
Present Land Use
Presently vacant; General Plan Disgnation - Light Industrial & Public Facilities; Zoning - Heavy Agriculture & Industrial Park
Document Description
The proposed project is a plan to develop the Stage 2 portion of the Day Creek Master Drainage Plan Line J storm drain facility. The project consists of a facility construction and subsequent maintenance. The downstream end of Line J, Stage 2 will connect to an existing 6-foot high by 12-foot wide RCB culvert that crosses underneath 68th Street near the northeast corner of the intersection of 68th Street and I-15. From the connection at 68th Street, Line J extends northerly where it connects to an existing upstream portion of Line J on the westerly side of Pats Ranch Road. Line J, Stage 2 will be closed conduit constructed below the earth's surface (existing or proposed) and will be installed using typical trenching methods.

Contact Information

Name
Kris Flanigan
Agency Name
Riverside County Flood Control and Water Conservation Dist
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
68th Street & Pats Ranch Road
Zip
91752
Total Acres
~0.5
Parcel #
152-020-012; -630-027; -640-003
State Highways
I-15
Railways
No
Airports
No
Schools
Several Elementary
Waterways
Santa Ana River
Township
2S
Range
6W
Section
19
Base
SBB&M
Other Location Info
City/Nearest Community: Eastvale

Notice of Determination

Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.