SCH Number 2010122014
Project Info
- Title
- Grimes Water System Improvements
- Description
- The proposed project includes storage tank installation, installation of a new water main, replacing the existing well pump and motors and the existing discharge piping and valves at Well Nos. 1 and 2 as required. A new 6-inch PVC water main pipe would be installed from Well No. 1 to the Well No. 2 site to interconnect with Well No. 2 prior to and separate from the arsenic treatment system (Figure 2). The new water main would be ~ 800 ft. A new chemical feed system would be installed at the Well No. 2 site for water treatment.
2 documents in project