SCH Number 2010072066


Project Info

Title
Sanchez Creek Bank Stabilization Project
Description
The proposed project consists of bank stabilization on Sanchez Creek. An 85 ft wood retaining wall would be replaced and a potting shed and sidewalk that is destabilized would be removed. Eroded bank soils will be excavated, a one foot deep concrete footing will be placed at the bottom of the trench and then Allan Blocks will be placed sequentially from the base of the bank to the top. Geogrid, gravel and soil will be placed in layers against the re-contoured bank. Two parallel 75 ft PVC pipe sub-drains will then be installed. A 15 ft long by 11 ft wide deck extension will be placed on the south end. The creek will be dewatered by temporary cofferdams and a diversion pipe will transport water around the work area.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Fish & Game #3 Sanchez Creek Bank Stabilization Project
Fish & Game #3 Sanchez Creek Bank Stabilization Project