Sanchez Creek Bank Stabilization Project

2 Documents in Project

Summary

SCH Number
2010072066
Lead Agency
Planning and Research, Office of (Office of Planning and Research)
Document Title
Sanchez Creek Bank Stabilization Project
Document Type
MND - Mitigated Negative Declaration
Received

Document Description
The proposed project is a bank stabilization on the southeast bank of Sanchez Creek. An 85-foot wood retaining wall would be replaced and a potting shed and sidewalk that is destabilized would be removed. Eroded bank soils will be excavated, a 1-ft deep concrete footing will be placed at the bottom of the trench and the Allan Blacks will be placed sequentially from the base of the bank to the top. Geogrid, gravel and soil will be placed in layers against the re-contoured bank. Two parallel 75-ft PVC pipe sub-drains will then be installed. A 15-ft long by 11-ft wide deck extension will be placed on the south end. The creek will be dewatered by temporary cofferdams and a diversion pipe will transport water around the work area.

Contact Information
Suzanne DeLeon
California Department of Fish and Game
P.O. Box 47
Yountville, CA 94599

831-345-8508

Location

Cities
Burlingame
Counties
San Mateo
Cross Streets
Drake Ave and Sanchez
Zip
94010
Total Acres
0.15
Parcel #
026-185-020
State Highways
Hwy 82, 101
Schools
N. Hillsborough/Crocket
Waterways
Sanchez Creek

Notice of Completion

Review Period Start
Review Period End
Development Type
Residential (1 Units, 0.15 Acres)
Local Action
Other Action
Project Issues
Water Quality Vegetation Soil Erosion/Compaction/Grading Geologic/Seismic Biological Resources Archaeologic-Historic
Reviewing Agencies
California Department of Parks and Recreation Caltrans, District 4 Department of Water Resources Native American Heritage Commission Regional Water Quality Control Board, Region 2 Resources Agency State Water Resources Control Board, Division of Water Rights
Download CSV New Search