SCH Number 2010072060
Project Info
- Title
- Summit Reservoir Replacement Project
- Description
- The Summit Reservoir Replacement Project entails demolition of a 37-million gallon (MG) open-cut reservoir and roof system and decommissioning of the Woods and Shasta Pumping Plants located below the southwestern reservoir embankment. Construction includes a new 3.5-MG, partially buried concrete tank, replacement pumping plants and a new Summit flow control valve within a new structure, and replacements of the water distribution pipelines and drainage facilities on the site. The project would remove portions of the dam embankments to ensure that the remaining basin would be below the California Division of Safety of Dams' jurisdictional size. The entire reservoir basin would be re-graded and landscaped with a mixture of drought-tolerant grasses and shrubs interspersed with trees.
4 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | East Bay Municipal Utility District (EBMUD) | Summit Reservoir Replacement Project | |
FIN | East Bay Municipal Utility District (EBMUD) | Summit Reservoir Replacement Project | |
EIR | East Bay Municipal Utility District (EBMUD) | Summit Reservoir Replacement Project | |
NOP | East Bay Municipal Utility District (EBMUD) | Summit Reservoir Replacement Project |