SCH Number 2010062054


Project Info

Title
Yuba County 2030 General Plan Update
Description
The South Yuba Drainage Master Plan, originally adopted in 1981, is an engineering study outlining a basis for the required drainage improvements needed in south Yuba County areas of Linda and Olivehurst to adequately address internal drainage. The South Yuba Drainage Master Plan serves to implement Policy CD12.3 and Action CD15.2 of the 2030 Yuba County General Plan for which an EIR was certified and adopted on June 7, 2011. The South Yuba Drainage Master Plan is an engineering study outlining required drainage improvements to address existing and future development consistent with the 2030 General Plan. The Plan does not raise any new or different environmental impacts than those addressed in the General Plan EIR. Therefore, pursuant to Government Code Sections 15162 and 15168(c) no further environmental review is required and the 2030 Yuba County General Plan EIR will serves as the environmental document for the SYDMP. The Fish & Game fee was paid at the time of the certification of the 2030 General Plan EIR in June 2011 (2011FG-00018).
Download CSV New Search

 

6 documents in project

Type Lead/Public Agency Received Title
Yuba County EA 2022-0006 (Goldfields Parkway/Interceptor Canal)
Yuba County Yuba County 2021-2029 Housing Element and 2021 Public Health and Safety Element Update
Yuba County Yuba County 2030 General Plan Update
Yuba County Yuba County 2030 General Plan Update
Yuba County Yuba County 2030 General Plan Update
Yuba County Yuba County 2030 General Plan Update