SCH Number 2010062036
Project Info
- Title
- Zone 3 Flume Replacement Project
- Description
- PCWA proposes to re-route a segment of canal into an underground 42 inch ductile iron pipe that would run for ~1,295 ft. The raw water pipeline would be routed under Chicago Park Powerhouse Road to enter into the Secret Town Road right-of-way. Pipeline inlet and outlet structures would also be constructed. The project would decommission and remove or backfill existing flumes and segments of the open canal re-routed through the pipeline. Flumes would be disassembled and removed from the project site and all open canal channels would be backfilled and stabilized. All pavement disturbed within road rights-of-way would be replaced and a new layer of asphalt would be applied within disturbed areas.
2 documents in project