SCH Number 2010061083
Project Info
- Title
- Eurus Energy Borrego Land LLC
- Description
- The project is a Major Use Permit Modification to an approved (but un-built) solar facility. The proposed modification consists of a reduction in the project footprint and a change in the proposed CPV tracker technology from that approved P09-012. The modified project would include the production of 6.5 MW of power on an ~51 acre development area of the 288 acre site, where the original MUP was approved for development of the entire site.
2 documents in project