Deep Water Well Pump Station 15- Pump Test
Description
The project involves well pump testing at a maximum rate of 2,500 gallons per minute over a 24-hour period, producing groundwater of an estimated maximum quantity of four million gallons. The pumped groundwater would be discharged to surrounding lands or adjacent roadside ditche(s) around the project area requiring compliance with the National Pollutant Discharge Elimination System program. Safety fencing would be installed around the project area. The pump test information will be used for subsequent well development at the project site to increase supply capacity and water pressure thereby reducing overall health and safety risks to the community. The project ground disturbance area was previously surveyed, and no sensitive biological or cultual resources were identified.
Download CSV New Search

 

1 documents in project

Type Lead/Public Agency Received Title
Rio Linda/Elverta Water District Deep Water Well Pump Station 15- Pump Test