Deep Water Well Pump Station 15- Pump Test

1 Documents in Project

Summary

SCH Number
2010058228
Public Agency
Rio Linda/Elverta Water District
Document Title
Deep Water Well Pump Station 15- Pump Test
Document Type
NOE - Notice of Exemption
Received
Posted
5/25/2010
Document Description
project involves well pump testing at a maximum rate of 2,500 gallons per minute over a 24-hour period, producing groundwater of an estimated maximum quantity of four million gallons. The pumped groundwater would be discharged to surrounding lands or adjacent roadside ditche(s) around the project area requiring compliance with the National Pollutant Discharge Elimination System program. Safety fencing would be installed around the project area. The pump test information will be used for subsequent well development at the project site to increase supply capacity and water pressure thereby reducing overall health and safety risks to the community. The project ground disturbance area was previously surveyed, and no sensitive biological or cultual resources were identified.

Contact Information

Name
Mychael Cardenas
Agency Name
Rio Linda/Elverta Water District
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Other Location Info
City: Rio Linda

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15306, 15304
Reasons for Exemption
The project will be temporary; causing only minor alterations to land for groundwater assessment purposes and will therefore not pose a significant effect to the environment.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print