SCH Number 2010039018
Project Info
- Title
- Construction and Operation of Dr. Carreon Water Reservoir Plant 3
- Description
- The CDPH, as the Responsible Agency, will be issuing an amended water supply permit to Indio Water Authority for the addition of a second chlorine pump, conveyance pipeline, and injection point to the existing disinfection system at Plant 3 newly constructed reservoir. An addendum was prepared for minor technical changes to the previously approved MND and newly constructed project.
4 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Indio Water Authority | Permitting and Operation of Reservoir 3A | |
NOD | Indio Water Authority | Permitting and Operation of Reservoir 3A | |
NOD | Indio Water Authority | Dr. Carreon Water Reservoir | |
NOD | Indio Water Authority | Construction and Operation of Dr. Carreon Water Reservoir Plant 3 |