Permitting and Operation of Reservoir 3A

4 Documents in Project

Summary

SCH Number
2010039018
Lead Agency
Indio Water Authority
Document Title
Permitting and Operation of Reservoir 3A
Document Type
NOD - Notice of Determination
Received

Document Description
Indio Water Authority is proposing to operate a new 2.5 million gallon steel water storage reservoir on an existing well and reservoir site known as the Plant 3 Facility. The proposed reservoir is ~126 ft in diameter and 32 ft in height. Additional yard piping has been constructed to connect the new reservoir to the existing storage and pumping facilities.

Contact Information
J. Steven Williams
CA Department of Public Health
CDPH Riverderside District Office 1350 Front Street, Rm 2050
San Diego, CA 92101

619-525-4159

Location

Cities
Indio
Counties
Riverside

Notice of Determination

Approving Agency
CDPH Riverside DO
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDPH Riverside DO Division of Drinking Water and Environmental Management 1350 Front Street, Rm 2050 San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search