SCH Number 2009112019


Project Info

Title
Construction of a Setback Levee at Sacramento River Mile 57.2R, Sacramento River Bank Protection Project
Description
The Central Valley Flood Protection Board and U.S. Army Corps of Engineers propose to construct a levee setback of the existing levee at Sacramento River Mile 57.2 Right under the authority of the Sacramento River Bank Protection Project. Elements of the proposed include: construction of a setback levee with a slurry wall; degradation of the existing levee; relocation of S. River Road to crest of new levee; modification to existing Chevron Pipeline; deposition of excess soil area west of site; and addition of excavated material to end.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Central Valley Flood Protection Board Construction of a Setback Levee at Sacramento River Mile 57.2R, Sacramento River Bank Protection Project
Central Valley Flood Protection Board Construction of a Setback Levee at Sacramento River Mile 57.2R, Sacramento River Bank Protection Project