Construction of a Setback Levee at Sacramento River Mile 57.2R, Sacramento River Bank Protection Project
2 Documents in Project
Summary
SCH Number
2009112019
Lead Agency
Central Valley Flood Protection Board
Document Title
Construction of a Setback Levee at Sacramento River Mile 57.2R, Sacramento River Bank Protection Project
Document Type
NOD - Notice of Determination
Received
Posted
5/20/2010
Document Description
The Central Valley Flood Protection Board and U.S. Army Corps of Engineers propose to construct a levee setback of the existing levee at Sacramento River Mile 57.2 Right under the authority of the Sacramento River Bank Protection Project. Elements of the proposed include: construction of a setback levee with a slurry wall; degradation of the existing levee; relocation of S. River Road to crest of new levee; modification to existing Chevron Pipeline; deposition of excess soil area west of site; and addition of excavated material to end.
Contact Information
Name
Kip Young
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
West Sacramento
Counties
Yolo
Cross Streets
South River Road
Zip
95691
Total Acres
25.6
Parcel #
46-010-11, 67-180-02, 67-180-03
State Highways
5, 80, 160
Schools
8 Schools
Waterways
Sacramento River, Sacramento Deep Water Channel
Township
8N
Range
4E
Section
11
Base
MDB&M
Notice of Determination
Approving Agency
CVFPB
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.