SCH Number 2009051122


Project Info

Title
Conditional Use Permit 2100 - Electrical Peaking Power Generation Unit
Description
The proposed project consist of a 49.6-megawatt natural-gas-fueled turbine (housed in a sound-attenuation enclosure) and associated equipment on the westerly side of the subject property. Other ancillary equipment includes, a gas compressor, power plant control systems, water pumps, water tanks, emission control monitors, and an aqueous ammonia storage tank. A collection system for potential seepage of nuisance fluids (turbine and gear box lubricants) and a storage vault would be located within the turbine enclosure.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of El Cajon Conditional Use Permit 2100 - Electrical Peaking Power Generation Unit
City of El Cajon Conditional Use Permit 2100 - Electrical Peaking Power Generation Unit