Conditional Use Permit 2100 - Electrical Peaking Power Generation Unit

2 Documents in Project

Summary

SCH Number
2009051122
Lead Agency
City of El Cajon
Document Title
Conditional Use Permit 2100 - Electrical Peaking Power Generation Unit
Document Type
NOD - Notice of Determination
Received
Posted
7/20/2009
Present Land Use
Vacant / C-M (Heacy Commercial, Light Industrial) / Light Industrial
Document Description
The proposed project consist of a 49.6-megawatt natural-gas-fueled turbine (housed in a sound-attenuation enclosure) and associated equipment on the westerly side of the subject property. Other ancillary equipment includes, a gas compressor, power plant control systems, water pumps, water tanks, emission control monitors, and an aqueous ammonia storage tank. A collection system for potential seepage of nuisance fluids (turbine and gear box lubricants) and a storage vault would be located within the turbine enclosure.

Contact Information

Name
Tony Shute
Agency Name
City of El Cajon
Contact Types
Lead/Public Agency

Location

Cities
El Cajon
Counties
San Diego
Cross Streets
West Main St and Benedict Ave
Zip
92020
Total Acres
2.2
Parcel #
487-121-65
State Highways
8, 67, 94, 125
Railways
San Diego & Arizona
Airports
Gillespie Field
Schools
Multiple
Waterways
Forrester Creek
Township
16S
Range
1W
Base
SBB&M

Notice of Determination

Approving Agency
Planning Commission of the City of El Cajon
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print