- Title
- Porter College Phase 2 House A Seismic
- Description
- The project will add a 5th and 6th floor to Porter College House A, an existing 50,800 gsf, 4 story student residence hall. The Project will add 30,500 gsf to the existing buildings and would accommodate 177 new student beds, including 150 beds on the new 5th and 6th floors and an additional 27 beds on the existing floors through internal space reconfiguration. The existing roof and 4th floor walls will be demolished to the floor slab, the 4th floor walls will be reconstructed, an additional 5th and 6th floor will be added , and the roof will be replaced. The Project will increase the height of the existing building from 51 ft 72.5 ft. Project construction will take place in conjunction will be partially concurrent with on-going construction on the Porter B Addition project and the Porter College Dining Common renovations previously approved by the University as Phase I of Porter College Seismic and Capital Renewal in Jully 2008.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | University of California | Porter College Phase 2 -- House a Seismic, Capital Renewal and Expansion Project | |
NOD | University of California | Porter College Phase 2 -- House a Seismic, Capital Renewal and Expansion Project | |
MND | University of California | Porter College Phase 2 House A Seismic |