Porter College Phase 2 -- House a Seismic, Capital Renewal and Expansion Project
3 Documents in Project
Summary
SCH Number
2009022062
Lead Agency
University of California
Document Title
Porter College Phase 2 -- House a Seismic, Capital Renewal and Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
5/18/2009
Document Description
The project will add a 5th and 6th floor to Porter College House A, an existing 50,800 gsf, 4 story student residence hall. The Project will add 30,500 gsf to the existing buildings and would accommodate 177 new student beds, including 150 beds on the new 5th and 6th floors and an additional 27 beds on the existing floors through internal space reconfiguration. The existing roof and 4th floor walls will be demolished to the floor slab, the 4th floor walls will be reconstructed, an additional 5th and 6th floor will be added , and the roof will be replaced. The Project will increase the height of the existing building from 51 ft 72.5 ft. Project construction will take place in conjunction will be partially concurrent with on-going construction on the Porter B Addition project and the Porter College Dining Common renovations previously approved by the University as Phase I of Porter College Seismic and Capital Renewal in Jully 2008.
Contact Information
Name
Sally Morgan
Agency Name
University of California, Planning Design & Construction
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Heller Drive and Meyer Drive
Zip
95064
Total Acres
0.25
Parcel #
01-011-13
State Highways
1
Railways
No
Airports
No
Schools
Westlake ES
Waterways
San Lorenzo River
Township
11S
Range
2W
Base
MDB&M
Notice of Determination
Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.