SCH Number 2009021105


Project Info

Title
Yucaipa Valley Regional Brineline Extension Project
Description
The Project will provide an estimated 3,311 acre-feet per year of Title 22 recycled water by the year 2020, and comply with the requirements of the Waste Discharge Requirements that include stringent water quality objectives for total dissolved solids and nitrogen. The Project will also help meet existing and planned water demands by maximizing recycled water use and reduce reliance on groundwater and State Water Project. The Project will involve: 1) constructing approximately 5,900 linear feet of 24-inch recycled water distribution pipeline and appurtenances, two one million gallon non-potable steel water reservoirs, and two booster pump stations; 2) installing a 2.5 million gallon per day reverse osmosis (RO) treatment system, an instrumentation and control system, and power supply and distribution facilities; 3) relocating or demolishing buildings, as needed; and 4) conducting site preparation, access and security improvements. The RO treatment system will be constructed in an enclosed building (80-feet by 225-feet), which will house the feeder pumps, cartridge filters, pressure vessel valves and instrumentation.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Yucaipa Valley Water District Phase I Non-Potable Water Distribution System Expansion and Salinity Management Project; Water Recycling Funding Program Grant Project No. 3817-030 and WRFP Loa
Yucaipa Valley Water District Yucaipa Valley Regional Brineline Extension Project
Yucaipa Valley Water District Yucaipa Valley Regional Brineline Extension Project