Phase I Non-Potable Water Distribution System Expansion and Salinity Management Project; Water Recycling Funding Program Grant Project No. 3817-030 and WRFP Loa

3 Documents in Project

Summary

SCH Number
2009021105
Lead Agency
Yucaipa Valley Water District
Document Title
Phase I Non-Potable Water Distribution System Expansion and Salinity Management Project; Water Recycling Funding Program Grant Project No. 3817-030 and WRFP Loa
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2011
Document Description
The Project will provide an estimated 3,311 acre-feet per year of Title 22 recycled water by the year 2020, and comply with the requirements of the Waste Discharge Requirements that include stringent water quality objectives for total dissolved solids and nitrogen. The Project will also help meet existing and planned water demands by maximizing recycled water use and reduce reliance on groundwater and State Water Project. The Project will involve: 1) constructing approximately 5,900 linear feet of 24-inch recycled water distribution pipeline and appurtenances, two one million gallon non-potable steel water reservoirs, and two booster pump stations; 2) installing a 2.5 million gallon per day reverse osmosis (RO) treatment system, an instrumentation and control system, and power supply and distribution facilities; 3) relocating or demolishing buildings, as needed; and 4) conducting site preparation, access and security improvements. The RO treatment system will be constructed in an enclosed building (80-feet by 225-feet), which will house the feeder pumps, cartridge filters, pressure vessel valves and instrumentation.

Contact Information

Name
Lisa Lee
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Loma Linda, Redlands, San Bernardino, Yucaipa
Counties
Riverside, San Bernardino
State Highways
I-10, I-215
Railways
BNSF
Airports
SB Int'l, Redlands Municipal
Schools
Several
Waterways
Santa Ana River

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print