SCH Number 2008121083


Project Info

Title
Dalton Plant - New Well and Demolition of Existing Reservoir
Description
Golden State Water Company proposes to drill, develop and equip a new well (Dalton Well #2) with a capacity of 1,000 gpm and install appurtenant equipment such as a disinfection facility, a chemical storage facility a motor control center, any required water treatment system beyond disinfection, and all necessary valves and piping. The source of water for this project is pumped groundwater from the West Basin. The well will be ~1,000 ft deep and be equipped with a vertical turbine pump. Sodium hypochlorite and ammonia will be provided for disinfection. Before the new well can be drilled, an existing booster station and an existing non0operational 2 million gallon underground concrete reservoir will be demolished.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California Department of Public Health (CDPH) New Well and Demolition of Existing Reservoir for Golden State Water Company
California Department of Public Health (CDPH) Dalton Plant - New Well and Demolition of Existing Reservoir