New Well and Demolition of Existing Reservoir for Golden State Water Company

2 Documents in Project

Summary

SCH Number
2008121083
Lead Agency
California Department of Public Health (CDPH)
Document Title
New Well and Demolition of Existing Reservoir for Golden State Water Company
Document Type
NOD - Notice of Determination
Received
Posted
2/9/2009
Document Description
Golden State Water Company proposes to drill, develop and equip a new well (Dalton Well #2) with a capacity of 1,000 gpm and install appurtenant equipment such as a disinfection facility, a chemical storage facility a motor control center, any required water treatment system beyond disinfection, and all necessary valves and piping. The source of water for this project is pumped groundwater from the West Basin. The well will be ~1,000 ft deep and be equipped with a vertical turbine pump. Sodium hypochlorite and ammonia will be provided for disinfection. Before the new well can be drilled, an existing booster station and an existing non0operational 2 million gallon underground concrete reservoir will be demolished.

Contact Information

Name
Veronica L. Malloy
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Gardena
Counties
Los Angeles
Cross Streets
Artesia
Zip
90247
Total Acres
0.71
Parcel #
6106-032-800
State Highways
110, 405, 105
Schools
Riley HS, Gardena

Notice of Determination

Approving Agency
CA Dept of Public Health
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print