- Stockton Station 85 Potable Water Transmission Pipeline Project
- Description
- Cal Water installed a new groundwater supply well and infrastructure associated with well operations in 2006. During construction, a contamination of Arsenic was discovered and the project was halted pending treatment alternative evaluation. Cal Water installed a blending facility that connected existing water wells to treat for Arsenic contamination in 2007. The proposed project consists of installing a well collecting pipeline (WCP) from Well 85 to the blending facility. The WCP will consist of a 16 inch diameter pipe with a total length of 6,480 ft.