SCH Number 2008112015


Project Info

Title
Stockton Station 85 Potable Water Transmission Pipeline Project
Description
Cal Water installed a new groundwater supply well and infrastructure associated with well operations in 2006. During construction, a contamination of Arsenic was discovered and the project was halted pending treatment alternative evaluation. Cal Water installed a blending facility that connected existing water wells to treat for Arsenic contamination in 2007. The proposed project consists of installing a well collecting pipeline (WCP) from Well 85 to the blending facility. The WCP will consist of a 16 inch diameter pipe with a total length of 6,480 ft.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California Health and Human Services Agency (CHHS) Stockton Station 85 Potable Water Transmission Pipeline Project
California Health and Human Services Agency (CHHS) Stockton Station 85 Potable Water Transmission Pipeline Project