Stockton Station 85 Potable Water Transmission Pipeline Project

2 Documents in Project

Summary

SCH Number
2008112015
Lead Agency
Health and Human Services, State of California (State of California Health and Human Services Agency)
Document Title
Stockton Station 85 Potable Water Transmission Pipeline Project
Document Type
NOD - Notice of Determination
Received

Document Description
Cal Water installed a new groundwater supply well and infrastructure associated with well operations in 2006. During construction, a contamination of Arsenic was discovered and the project was halted pending treatment alternative evaluation. Cal Water installed a blending facility that connected existing water wells to treat for Arsenic contamination in 2007. The proposed project consists of installing a well collecting pipeline (WCP) from Well 85 to the blending facility. The WCP will consist of a 16 inch diameter pipe with a total length of 6,480 ft.

Contact Information
Joseph Spano
CA Department of Public Health
CDPH Stockton District Office 31 East Channel Street, Rm 270
Stockton, CA 95202

209-948-7696

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
945 Stokes Ave.
Parcel #
143-280-05
State Highways
99
Railways
Yes
Waterways
Stockton Diverting Canal
Township
2N
Range
7E
Section
31

Notice of Determination

Approving Agency
CDPH Stockton DO
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
CDPH Stockton District Office 31 East Channel St, Rm 270 Stockton, CA 95202

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search