Cabazon Wastewater Facilities Project
Description
The Cabazon Wastewater Facilities Project (Project) consists of constructing and operating regional wastewater system facilities that are intended to serve the community of Cabazon. Project facilities are described in detail in the project Initial Study. Phase I facilities, anticipated for construction within the next one to two years, consist of Trunk Sewer A (a 12-inch to 15-inch diameter gravity sewer to be constructed within the public street rights-of-way of Carmen Avenue, Almond Street, Dolores Avenue, and in Cabazon Water District [CWD]-owned property with Assessor's Parcel Number [APN] 525-107-009) and two 6-inch to 8-inch diameter sewer laterials. Phase II, anticipated for construction within the next one to two years, including either a Wastewater Treatment Plant located within CWD-owned property (APN 525-170-009) or an Interim Lift Station located within APN 525-170-009 and the Elm Street Force Main, which would extend northerly therefrom within Elm Street, then connect to an existing 8-inch diameter force main at the existing Arrowhead Water Bottling Plant. Said existing 8-inch diameter force main currently conveys watewater from the Arrowhead Water Bottling Plant to an existing wastewater treatment plant that is owned and operation by the Morongo Band of Mission Indians and is located just north of Interstate 10. If this alternative is selected, wastewater flows conveyed through the Elm Street Force Main would be treated at said existing wastewater treatment plant.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Riverside County Redevelopment Agency Proposed Cabazon Wastewater Sewer - Trunk A Line
Riverside County Redevelopment Agency Cabazon Wastewater Facilities Project