Proposed Cabazon Wastewater Sewer - Trunk A Line

2 Documents in Project

Summary

SCH Number
2008101035
Lead Agency
Riverside County Redevelopment Agency
Document Title
Proposed Cabazon Wastewater Sewer - Trunk A Line
Document Type
NOD - Notice of Determination
Received
Posted
12/8/2008
Present Land Use
GP: Rural Residential, Rural Desert, Conservation, Light Industrial, Medium Density Residential Zoning: Watercourse, Watershed, and Conservation Areas; Controlled Developmetn Areas; Controlled Development with Mobilehomes; Residential Agriculture
Document Description
The Cabazon Wastewater Facilities Project (Project) consists of constructing and operating regional wastewater system facilities that are intended to serve the community of Cabazon. Project facilities are described in detail in the project Initial Study. Phase I facilities, anticipated for construction within the next one to two years, consist of Trunk Sewer A (a 12-inch to 15-inch diameter gravity sewer to be constructed within the public street rights-of-way of Carmen Avenue, Almond Street, Dolores Avenue, and in Cabazon Water District [CWD]-owned property with Assessor's Parcel Number [APN] 525-107-009) and two 6-inch to 8-inch diameter sewer laterials. Phase II, anticipated for construction within the next one to two years, including either a Wastewater Treatment Plant located within CWD-owned property (APN 525-170-009) or an Interim Lift Station located within APN 525-170-009 and the Elm Street Force Main, which would extend northerly therefrom within Elm Street, then connect to an existing 8-inch diameter force main at the existing Arrowhead Water Bottling Plant. Said existing 8-inch diameter force main currently conveys watewater from the Arrowhead Water Bottling Plant to an existing wastewater treatment plant that is owned and operation by the Morongo Band of Mission Indians and is located just north of Interstate 10. If this alternative is selected, wastewater flows conveyed through the Elm Street Force Main would be treated at said existing wastewater treatment plant.

Contact Information

Name
Tony Resendez
Agency Name
Riverside County Redevelopment Agency
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Cross Streets
Apache Trail on the west, Elm Street on the east, Esperanza Avenue on the south
Zip
92230
Total Acres
15
Parcel #
525-170-009 , 525-170-015
State Highways
I-215
Railways
Union Pacific
Airports
Banning Municipal
Schools
Cabazon Elementary
Waterways
San Gorgonio River,Cabazon Channel,Smith Creek,Twin Pines Creek,Millard Canyon,Deep Canyon,
Township
3S
Range
2E
Section
14-17
Base
SBM
Other Information
Section: 20-23 Waterways:Colorado River Aqueduct

Notice of Determination

Approving Agency
Riverside County Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print