SCH Number 2008081115


Project Info

Title
Paso Robles Watertreatment Plan and Main East Pipeline Project
Description
The treatment plant will be situated at the City's Thunderbird Well Site located east of Ramada Drive and the UPRR, west of the Salinas River and north of an imaginary extension of Hwy 46W east of Ramada Drive. The Main East Pipline will extend from the proposed treatment plant, along the east side of the UPRR, to a point due west of the western terminus of the existing right-of-way for a westward extension of Charolias Rd. At that point, the pipeline will turn due east, run beneath the Salinas River and through the existing righ-of-way for a westward extension of Charolais Rd to connect with existing water mains in S. River Rd. The entire project will be located within the corporate limits of the City of Paso Robles, CA.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Paso Robles Paso Robles Watertreatment Plan and Main East Pipeline Project
City of Paso Robles Paso Robles Watertreatment Plan and Main East Pipeline Project