Paso Robles Watertreatment Plan and Main East Pipeline Project

2 Documents in Project

Summary

SCH Number
2008081115
Lead Agency
City of Paso Robles
Document Title
Paso Robles Watertreatment Plan and Main East Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2009
Document Description
The treatment plant will be situated at the City's Thunderbird Well Site located east of Ramada Drive and the UPRR, west of the Salinas River and north of an imaginary extension of Hwy 46W east of Ramada Drive. The Main East Pipline will extend from the proposed treatment plant, along the east side of the UPRR, to a point due west of the western terminus of the existing right-of-way for a westward extension of Charolias Rd. At that point, the pipeline will turn due east, run beneath the Salinas River and through the existing righ-of-way for a westward extension of Charolais Rd to connect with existing water mains in S. River Rd. The entire project will be located within the corporate limits of the City of Paso Robles, CA.

Contact Information

Name
Ed Gallagher
Agency Name
City of Paso Robles
Contact Types
Lead/Public Agency

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
Ramada Drive and Highway 46 West
Zip
93446
Parcel #
009-631-001
State Highways
101 and 46 West
Railways
UPRR
Airports
No
Schools
No
Waterways
Salinas River
Township
27S
Range
12E
Section
9
Base
MDB&M

Notice of Determination

Approving Agency
City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.