SCH Number 2008072103


Project Info

Title
Big Bear Flat Restoration Project
Description
The project is limited to the addition of a single rock vane to the existing grade control structure and any required routine maintenance at the downstream end of the Big Bear Flat Restoration Project. Estimated material for the additional vane includes approximately 48 cubic yards of rock sized between six and 36 inches.
Download CSV New Search

 

3 documents in project

Type Lead Agency Received Title
Fall River Resource Conservation Demonstration Lake or Streambed Alteration Agreement No. 1600-2014-0277-R1
Fall River Resource Conservation Demonstration Lake or Streambed Alteration Agreement No. R1-09-0076 Big Bear Flat Restoration Project
Fall River Resource Conservation Demonstration Big Bear Flat Restoration Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.