SCH Number 2008071031
Project Info
- Title
- Ridgemark Wastewater Treatment and Recycled Water Improvements Project
- Description
- The Project will consolidate and upgrade the RM I and RM II facilities. The new facilities include headworks, sequencing batch reactor, and solids handling facilities at the RM I site. Effluent from sequencing batch reactor will be pumped to the existing percolation ponds at the RM I site for disposal. Waste activated sludge from the sequencing batch reactor will be pumped to the biosolids storage basin on a daily basis. The biosolids will be continually aerated in the storage basin then pumped to adjacent covered solids drying beds for dewatering during dry weather periods. Dried solid will be hauled to a landfill for disposal. A new operations building will also be built on RM I site for system control, operation, and maintenance needs. An emergency diesel generator will be installed outside the operations building. Also, a pump station and a conveyance pipeline will be built at the RM II site to convey raw wastewater from the RM II facility to the RM I facility. The existing RM I and RM II treatment ponds will be decommissioned.
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Sunnyslope County Water District (SCWD) | Ridgemark Wastewater Treatment and Recycled Water Improvements Project | |
FIN | Sunnyslope County Water District (SCWD) | Ridgemark Wastewater Treatment and Recycled Water Improvements Project | |
NOD | Sunnyslope County Water District (SCWD) | Ridgemark Wastewater Treatment and Recycled Water Improvements Project | |
EIR | Sunnyslope County Water District (SCWD) | Ridgemark Wastewater Treatment and Recycled Water Improvements Project | |
NOP | Sunnyslope County Water District (SCWD) | Ridgemark Wastewater Treatment and Recycled Water Improvements Project |