Ridgemark Wastewater Treatment and Recycled Water Improvements Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008071031
- Lead Agency
- Sunnyslope County Water District (SCWD)
- Document Title
- Ridgemark Wastewater Treatment and Recycled Water Improvements Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/22/2010
- Present Land Use
- GP: R/URB (Rural/Urban)
- Document Description
- The Project will consolidate and upgrade the RM I and RM II facilities. The new facilities include headworks, sequencing batch reactor, and solids handling facilities at the RM I site. Effluent from sequencing batch reactor will be pumped to the existing percolation ponds at the RM I site for disposal. Waste activated sludge from the sequencing batch reactor will be pumped to the biosolids storage basin on a daily basis. The biosolids will be continually aerated in the storage basin then pumped to adjacent covered solids drying beds for dewatering during dry weather periods. Dried solid will be hauled to a landfill for disposal. A new operations building will also be built on RM I site for system control, operation, and maintenance needs. An emergency diesel generator will be installed outside the operations building. Also, a pump station and a conveyance pipeline will be built at the RM II site to convey raw wastewater from the RM II facility to the RM I facility. The existing RM I and RM II treatment ponds will be decommissioned.
- Contact Information
-
Michelle Lobo
State Water Resources Control Board
Lead/Public Agency
Division of Financial Assistant 1001 I Street 16th Floor
Sacramento, CA 95814
Phone : (916) 341-6983
Location
- Coordinates
- 36°48'42"N 121°22'41"W
- Cities
- Hollister
- Counties
- San Benito
- Cross Streets
- Airline Highway and Ridgemark Drive
- Zip
- 95023
- State Highways
- 25
- Railways
- UPRR
- Schools
- Southside, Cerra Vista
- Waterways
- San Benito River
- Township
- 13S
- Range
- 5E/6E
- Base
- MDB&M
Notice of Determination
- Approving Agency
- State Water Resources Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- State Water Board, Division of FInancial Assistance 1001 I Street, 16th Floor Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.