Ridgemark Wastewater Treatment and Recycled Water Improvements Project

5 Documents in Project

Summary

SCH Number
2008071031
Lead Agency
Sunnyslope County Water District (SCWD)
Document Title
Ridgemark Wastewater Treatment and Recycled Water Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
12/22/2010
Present Land Use
GP: R/URB (Rural/Urban)
Document Description
The Project will consolidate and upgrade the RM I and RM II facilities. The new facilities include headworks, sequencing batch reactor, and solids handling facilities at the RM I site. Effluent from sequencing batch reactor will be pumped to the existing percolation ponds at the RM I site for disposal. Waste activated sludge from the sequencing batch reactor will be pumped to the biosolids storage basin on a daily basis. The biosolids will be continually aerated in the storage basin then pumped to adjacent covered solids drying beds for dewatering during dry weather periods. Dried solid will be hauled to a landfill for disposal. A new operations building will also be built on RM I site for system control, operation, and maintenance needs. An emergency diesel generator will be installed outside the operations building. Also, a pump station and a conveyance pipeline will be built at the RM II site to convey raw wastewater from the RM II facility to the RM I facility. The existing RM I and RM II treatment ponds will be decommissioned.

Contact Information

Name
Michelle Lobo
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Hollister
Counties
San Benito
Cross Streets
Airline Highway and Ridgemark Drive
Zip
95023
State Highways
25
Railways
UPRR
Schools
Southside, Cerra Vista
Waterways
San Benito River
Township
13S
Range
5E/6E
Base
MDB&M

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print